Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Chargeplace Scotland · EV charging site

Fetlar Interpretive Centre

Beach of Houbie, Fetlar, ZE2 9DJ

Fetlar Interpretive Centre is an EV charging site in Fetlar, Shetland Islands, run by Chargeplace Scotland. Both of its sockets are 22 kW Type 2, and charging is listed as free. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Ulsta Shetland Ferry Terminal, Yell (Chargeplace Scotland), 12.2 miles away.

Status

Out of service

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 30 Jun 2025Last verified 30 Jun 2025

Connectors

Type 2 · 22 kW2 connectors

Site information

Opening hours
Not published
Access
Public · membership required · access key required
Price
Free(from Open Charge Map, 30 Jun 2025)
Phone (from Open Charge Map)
0141 648 0750

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 22 kW Type 2~5h 2m
Tesla Model 3 Rear-Wheel Drive 10–80% · 22 kW Type 2~3h 38m
Audi Q4 e-tron 50 10–80% · 22 kW Type 2~4h 39m
Hyundai IONIQ 5 10–80% · 22 kW Type 2~4h 37m
MG Motor MG4 Trophy 10–80% · 22 kW Type 2~3h 53m
Hyundai Kona Electric Long Range 10–80% · 22 kW Type 2~5h 38m
Nissan LEAF 10–80% · 22 kW Type 2~4h 15m

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Fetlar Interpretive Centre (Chargeplace Scotland)?

The listed price is Free. Prices can change, so check the price at the charger before you start.

How fast is charging at Fetlar Interpretive Centre (Chargeplace Scotland)?

Up to 22 kW AC via Type 2.

How many charging sockets does Fetlar Interpretive Centre (Chargeplace Scotland) have?

2 charging sockets: 2 × 22 kW Type 2.

Who operates Fetlar Interpretive Centre?

Fetlar Interpretive Centre is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.

Where is the nearest charger with 50 kW or more to Fetlar Interpretive Centre (Chargeplace Scotland)?

Ulsta Shetland Ferry Terminal, Yell (Chargeplace Scotland) is 12.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Fetlar Interpretive Centre (Chargeplace Scotland)?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Fetlar Interpretive Centre (Chargeplace Scotland)?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Fetlar Interpretive Centre (Chargeplace Scotland)?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 30 Jun 2025

Amp Map does not take payment. You pay the operator.