# Fife Renewables Innovation Centre · Chargeplace Scotland

Web page: https://ampmap.co.uk/charger/chargeplace-scotland-fife-renewables-innovation-centre-uk

Fife Renewables Innovation Centre is an EV charging site in Glenrothes, Fife, run by Chargeplace Scotland. Its 2 sockets reach up to 7 kW, with Type 2 at the top speed, and charging is listed as free.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Ajax Way, KY8 3RW
- **Area:** Glenrothes, Fife, United Kingdom
- **Coordinates (latitude, longitude):** 56.18692, -3.00007

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 2 | Not listed |
| Type 2 | 3 kW | 1 | Not listed |

- **Price:** Free (from Open Charge Map)

## Site information

- **Operator:** Chargeplace Scotland
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Fife Renewables Innovation Centre (Chargeplace Scotland)?

The listed price is Free. Prices can change, so check the price at the charger before you start.

### How fast is charging at Fife Renewables Innovation Centre (Chargeplace Scotland)?

Up to 7 kW AC via Type 2.

### How many charging sockets does Fife Renewables Innovation Centre (Chargeplace Scotland) have?

2 charging sockets: 1 × 3 kW Type 2, 2 × 7 kW Type 2.

### Who operates Fife Renewables Innovation Centre?

Fife Renewables Innovation Centre is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.

### How long does a Tesla Model Y Long Range take to charge at Fife Renewables Innovation Centre (Chargeplace Scotland)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Fife Renewables Innovation Centre (Chargeplace Scotland)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Fife Renewables Innovation Centre (Chargeplace Scotland)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Glenrothes](https://ampmap.co.uk/chargers/united-kingdom/fife/glenrothes)
- [Chargeplace Scotland chargers](https://ampmap.co.uk/networks/chargeplace-scotland)

## Chargers near this site

- [The Hydrogen Office · Zero Carbon World](https://ampmap.co.uk/charger/zero-carbon-world-the-hydrogen-office-uk) - Blue Commando (2P+E) 7 kW, BS1363 3 Pin 13 Amp 3 kW · Ajax Way
- [Leven Railway Station](https://ampmap.co.uk/charger/leven-railway-station-uk) - Type 2 22 kW · Leven Railway Station Car Park
- [South Street Car Park, Vale of Leven · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-south-street-car-park-vale-of-leven-uk) - Type 2 7 kW · South Street
- [Fife College, Levenmouth Campus, Buckhaven · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-fife-college-levenmouth-campus-buckhaven-uk) - Type 2 11 kW · Fife College, Levenmouth Campus, Buckhaven
- [College Street Car Park, Buckhaven · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-college-street-car-park-buckhaven-uk) - Type 2 22 kW · College Street Car Park
- [Homelands Trust-Fife](https://ampmap.co.uk/charger/chargeplace-scotland-homelands-trust-fife-uk) - Type 2 22 kW · Landlord Supply

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/chargeplace-scotland-fife-renewables-innovation-centre-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 22 Jun 2022).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
