# Gilbertson Park · Chargeplace Scotland

Web page: https://ampmap.co.uk/charger/chargeplace-scotland-gilbertson-park-uk

Gilbertson Park is an EV charging site in Lerwick, Shetland Islands, run by Chargeplace Scotland. It has a single socket, with CHAdeMO and CCS at up to 50 kW, and charging is listed as free.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Gilbertson Road, ZE1 0HN
- **Area:** Lerwick, Shetland Islands, United Kingdom
- **Coordinates (latitude, longitude):** 60.15531, -1.15536

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 50 kW | 1 | Not listed |
| CHAdeMO | 50 kW | 1 | Not listed |
| Type 2 | 43 kW | 1 | Not listed |

- **Price:** Free (from Open Charge Map)

## Site information

- **Operator:** Chargeplace Scotland
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Gilbertson Park (Chargeplace Scotland)?

The listed price is Free. Prices can change, so check the price at the charger before you start.

### How fast is charging at Gilbertson Park (Chargeplace Scotland)?

Up to 50 kW DC via CHAdeMO, Type 2, CCS.

### How many charging sockets does Gilbertson Park (Chargeplace Scotland) have?

1 charging socket: 1 × 50 kW CHAdeMO, 1 × 43 kW Type 2, 1 × 50 kW CCS.

### Who operates Gilbertson Park?

Gilbertson Park is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.

### How long does a Tesla Model Y Long Range take to charge at Gilbertson Park (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Gilbertson Park (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Gilbertson Park (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Lerwick](https://ampmap.co.uk/chargers/united-kingdom/shetland-islands/lerwick)
- [Chargeplace Scotland chargers](https://ampmap.co.uk/networks/chargeplace-scotland)

## Chargers near this site

- [Grantfield Council Offices · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-grantfield-council-offices-uk) - Type 2 7 kW · 43-45 North Road
- [Grantfield Offices · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-grantfield-offices-uk) - Type 2 7 kW · North Road
- [Lerwick Health Centre · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-lerwick-health-centre-uk) - Type 2 7 kW · South Road
- [Clickimin Leisure Centre · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-clickimin-leisure-centre-uk) - Type 2 7 kW · Lochside
- [ZE1 OLZ · Charge Your Car](https://ampmap.co.uk/charger/charge-your-car-ze1-olz-uk) - Type 2 7 kW
- [Fort Road Car Park, Lerwick · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-fort-road-car-park-lerwick-uk) - Type 2 7 kW · Fort Road

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/chargeplace-scotland-gilbertson-park-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 24 Apr 2019).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
