Chargeplace Scotland · EV charging site
Girvan Harbour
Knockcushan Street, Girvan, KA26 9AJ
Girvan Harbour is an EV charging site at Knockcushan Street in Girvan, South Ayrshire, run by Chargeplace Scotland. Its 2 sockets reach up to 50 kW, with CHAdeMO and CCS at the top speed, and charging is listed as free. Amp Map lists 1 other charge point named Girvan Harbour in Girvan. 2 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Girvan Harbour (Chargeplace Scotland), 160 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargeplace Scotland
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- Free(from Open Charge Map, 8 Aug 2019)
- Phone (from Open Charge Map)
- 0141 648 0750
- Notes
- Access by RFID card only, no app or telephone authorisation.
- Getting there
- Need to confirm exact location.
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Girvan Harbour (Chargeplace Scotland)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Girvan Harbour (Chargeplace Scotland)?
Up to 50 kW DC via CHAdeMO, CCS, Type 2.
How many charging sockets does Girvan Harbour (Chargeplace Scotland) have?
2 charging sockets: 1 × 50 kW CHAdeMO, 1 × 50 kW CCS, 1 × 43 kW Type 2, 1 × 22 kW Type 2.
Who operates Girvan Harbour?
Girvan Harbour is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.
Where is the nearest other charger with 50 kW or more to Girvan Harbour (Chargeplace Scotland)?
Girvan Harbour (Chargeplace Scotland) is 160 yards away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Girvan Harbour (Chargeplace Scotland)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Girvan Harbour (Chargeplace Scotland)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Girvan Harbour (Chargeplace Scotland)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.