# Glenloin Car Park · Chargeplace Scotland

Web page: https://ampmap.co.uk/charger/chargeplace-scotland-glenloin-car-park-uk

Glenloin Car Park is an EV charging site in Garelochhead, Argyll and Bute, run by Chargeplace Scotland. Its 2 sockets reach up to 50 kW, with CHAdeMO and CCS at the top speed.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** A83/Loch Long, G83 7AA
- **Area:** Garelochhead, Argyll and Bute, United Kingdom
- **Coordinates (latitude, longitude):** 56.20670, -4.74517

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 50 kW | 1 | Not listed |
| CHAdeMO | 50 kW | 1 | Not listed |
| Type 2 | 43 kW | 1 | Not listed |

- **Price:** £0.25/kWh. Parking Fees apply. (from Open Charge Map)

## Site information

- **Operator:** Chargeplace Scotland
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Glenloin Car Park (Chargeplace Scotland)?

The listed price is £0.25/kWh. Parking Fees apply.. Prices can change, so check the price at the charger before you start.

### How fast is charging at Glenloin Car Park (Chargeplace Scotland)?

Up to 50 kW DC via CHAdeMO, Type 2, CCS.

### How many charging sockets does Glenloin Car Park (Chargeplace Scotland) have?

2 charging sockets: 1 × 50 kW CHAdeMO, 1 × 43 kW Type 2, 1 × 50 kW CCS.

### Who operates Glenloin Car Park?

Glenloin Car Park is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.

### How long does a Tesla Model Y Long Range take to charge at Glenloin Car Park (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Glenloin Car Park (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Glenloin Car Park (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Garelochhead](https://ampmap.co.uk/chargers/united-kingdom/argyll-and-bute/garelochhead)
- [Chargeplace Scotland chargers](https://ampmap.co.uk/networks/chargeplace-scotland)

## Chargers near this site

- [Pod Point Forest Holidays - Ardgartan Argyll](https://ampmap.co.uk/charger/pod-point-forest-holidays-ardgartan-argyll-uk) - Type 2 7 kW · Ardgartan Arrochar · From 55.2p/kWh
- [Inveruglas Visitor Centre · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-inveruglas-visitor-centre-uk) - Type 2 7 kW · Inveruglas Farm

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/chargeplace-scotland-glenloin-car-park-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 22 Dec 2021).