# Gourock - Lower Kempock Street · Chargeplace Scotland

Web page: https://ampmap.co.uk/charger/chargeplace-scotland-gourock-lower-kempock-street-uk

Gourock - Lower Kempock Street is an EV charging site in Greenock, Inverclyde, run by Chargeplace Scotland. Its 3 sockets reach up to 50 kW, with Type 2 and CHAdeMO at the top speed.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Lower Kempock Stree, PA19 1NQ
- **Area:** Greenock, Inverclyde, United Kingdom
- **Coordinates (latitude, longitude):** 55.96104, -4.82205

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CHAdeMO | 50 kW | 1 | Not listed |
| Type 2 | 50 kW | 1 | Not listed |
| Type 2 | 43 kW | 1 | Not listed |

## Site information

- **Operator:** Chargeplace Scotland
- **Opening hours:** Not published
- **Access:** Public

## Common questions

### How fast is charging at Gourock - Lower Kempock Street (Chargeplace Scotland)?

Up to 50 kW DC via Type 2, CHAdeMO.

### How many charging sockets does Gourock - Lower Kempock Street (Chargeplace Scotland) have?

3 charging sockets: 1 × 43 kW Type 2, 1 × 50 kW Type 2, 1 × 50 kW CHAdeMO.

### Who operates Gourock - Lower Kempock Street?

Gourock - Lower Kempock Street is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.

### How long does a Tesla Model Y Long Range take to charge at Gourock - Lower Kempock Street (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Gourock - Lower Kempock Street (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Gourock - Lower Kempock Street (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Greenock](https://ampmap.co.uk/chargers/united-kingdom/inverclyde/greenock)
- [Chargeplace Scotland chargers](https://ampmap.co.uk/networks/chargeplace-scotland)

## Chargers near this site

- [Kempock Street Car Park · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-kempock-street-car-park-uk) - CCS 50 kW, CHAdeMO 50 kW · Lower Kempock Street
- [Station Road, Gourock · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-station-road-gourock-uk) - Type 2 7 kW · Station Road Car Park
- [The Pier Gourock · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-the-pier-gourock-uk) - Type 2 7 kW · Station Road
- [Battery Park, Greenock · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-battery-park-greenock-uk) - Type 2 22 kW, Type 2 7 kW · Battery Park
- [Branchton SF Connect · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-branchton-sf-connect-uk) - CCS 150 kW, CHAdeMO 100 kW · Inverkip Road, Branchton
- [West College Scotland, Greenock Campus, Greenock · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-west-college-scotland-greenock-campus-greenock-uk) - Type 2 22 kW · Finnart Street

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/chargeplace-scotland-gourock-lower-kempock-street-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 4 May 2023).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
