Chargeplace Scotland · EV charging site
Halbeath Park and Ride
Crossgates Road, Edinburgh, KY11 7EG
Halbeath Park and Ride is an EV charging site in Edinburgh, City of Edinburgh, run by Chargeplace Scotland. Both of its sockets are 22 kW Type 2. 9 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Pod Point Tesco Superstore - Leith, 0.6 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargeplace Scotland
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 0141 648 0750
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Halbeath Park and Ride (Chargeplace Scotland)?
Up to 22 kW AC via Type 2.
How many charging sockets does Halbeath Park and Ride (Chargeplace Scotland) have?
2 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2.
Who operates Halbeath Park and Ride?
Halbeath Park and Ride is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.
Where is the nearest charger with 50 kW or more to Halbeath Park and Ride (Chargeplace Scotland)?
Pod Point Tesco Superstore - Leith is 0.6 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Halbeath Park and Ride (Chargeplace Scotland)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Halbeath Park and Ride (Chargeplace Scotland)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Halbeath Park and Ride (Chargeplace Scotland)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Changeworks
- Pure Offices Leith - 0111
- FC18128
- Pod Point Tesco Superstore - Leith
- Lothian Buses Annandale Depot
- Pod Point Tesco Superstore - Broughton Road
- Cheapest nearby
- Pod Point Tesco Superstore - Leith · 44.4p per kWh · 50 kW · 0.6 mi
- Fastest nearby
- Pod Point Tesco Superstore - Leith · 50 kW · 0.6 mi