Chargeplace Scotland · EV charging site
Houton Ferry Terminal
Houton Ferry Terminal, Stromness, KW17 2RD
Houton Ferry Terminal is an EV charging site in Stromness, Orkney Islands, run by Chargeplace Scotland. Both of its sockets are 22 kW Type 2, and charging is listed as free. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Stromness Ferry Terminal Rapid (triple Outlet) (Chargeplace Scotland), 5.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargeplace Scotland
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- Free(from Open Charge Map, 9 Apr 2018)
- Phone (from Open Charge Map)
- 0141 648 0750
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Houton Ferry Terminal (Chargeplace Scotland)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Houton Ferry Terminal (Chargeplace Scotland)?
Up to 22 kW AC via Type 2.
How many charging sockets does Houton Ferry Terminal (Chargeplace Scotland) have?
2 charging sockets: 2 × 22 kW Type 2.
Who operates Houton Ferry Terminal?
Houton Ferry Terminal is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.
Where is the nearest charger with 50 kW or more to Houton Ferry Terminal (Chargeplace Scotland)?
Stromness Ferry Terminal Rapid (triple Outlet) (Chargeplace Scotland) is 5.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Houton Ferry Terminal (Chargeplace Scotland)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Houton Ferry Terminal (Chargeplace Scotland)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Houton Ferry Terminal (Chargeplace Scotland)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.