Chargeplace Scotland · EV charging site
Hw Energy
Lochaber Rural Complex, Fort William, PH33 6SQ
Hw Energy is an EV charging site in Fort William, Highland, run by Chargeplace Scotland. Both of its sockets are 7 kW Type 2, and charging is listed as free. 1 other charging site is listed within a mile, and the nearest site with 50 kW or more is IONITY GmbH IONITY Fort William, 3.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargeplace Scotland
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- Free(from Open Charge Map, 23 Mar 2020)
- Phone (from Open Charge Map)
- 0141 648 0750
- Notes
- This charge point is labelled as 22KW when, in fact, it is a 7KW charger with 2 connectors.
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Hw Energy (Chargeplace Scotland)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Hw Energy (Chargeplace Scotland)?
Up to 7 kW AC via Type 2.
How many charging sockets does Hw Energy (Chargeplace Scotland) have?
2 charging sockets: 2 × 7 kW Type 2.
Who operates Hw Energy?
Hw Energy is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.
Where is the nearest charger with 50 kW or more to Hw Energy (Chargeplace Scotland)?
IONITY GmbH IONITY Fort William is 3.5 miles away in a straight line, with up to 350 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Hw Energy (Chargeplace Scotland)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Hw Energy (Chargeplace Scotland)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Hw Energy (Chargeplace Scotland)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Nevis Range
- Sepa Fort William
- Camaghael Hostel, Fort William
- IONITY GmbH IONITY Fort William
- Claggan Charger
- The Old Pines Hotel
- Cheapest nearby
- IONITY GmbH IONITY Fort William · 83.3p per kWh · 350 kW · 3.5 mi
- Fastest nearby
- IONITY GmbH IONITY Fort William · 350 kW · 3.5 mi