# Hydrogen Centre · Chargeplace Scotland

Web page: https://ampmap.co.uk/charger/chargeplace-scotland-hydrogen-centre-uk

Hydrogen Centre is an EV charging site in Nigg, Aberdeen City, run by Chargeplace Scotland. Its 4 sockets reach up to 50 kW, with CHAdeMO and CCS at the top speed, and charging is listed as free.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Langdykes Road, AB12 3HW
- **Area:** Nigg, Aberdeen City, United Kingdom
- **Coordinates (latitude, longitude):** 57.10778, -2.09070

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 50 kW | 1 | Not listed |
| CHAdeMO | 50 kW | 1 | Not listed |
| Type 2 | 43 kW | 1 | Not listed |
| Type 2 | 22 kW | 2 | Not listed |

- **Price:** Free (from Open Charge Map)

## Site information

- **Operator:** Chargeplace Scotland
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Hydrogen Centre (Chargeplace Scotland)?

The listed price is Free. Prices can change, so check the price at the charger before you start.

### How fast is charging at Hydrogen Centre (Chargeplace Scotland)?

Up to 50 kW DC via Type 2, CHAdeMO, CCS.

### How many charging sockets does Hydrogen Centre (Chargeplace Scotland) have?

4 charging sockets: 1 × 43 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 50 kW CCS, 2 × 22 kW Type 2.

### Who operates Hydrogen Centre?

Hydrogen Centre is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.

### How long does a Tesla Model Y Long Range take to charge at Hydrogen Centre (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Hydrogen Centre (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Hydrogen Centre (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Nigg](https://ampmap.co.uk/chargers/united-kingdom/aberdeen-city/nigg)
- [Chargeplace Scotland chargers](https://ampmap.co.uk/networks/chargeplace-scotland)

## Chargers near this site

- [Shell Redmoss · Allego BV](https://ampmap.co.uk/charger/allego-bv-shell-redmoss-uk) - CCS 50 kW, CHAdeMO 50 kW · Wellington Road
- [Aberdeen, UK · Tesla](https://ampmap.co.uk/charger/tesla-aberdeen-supercharger-uk) - CCS 250 kW · Wellington Circle · From 30p/kWh
- [Nissan Specialist Cars · Nissan UK Dealer Network](https://ampmap.co.uk/charger/nissan-uk-dealer-network-nissan-specialist-cars-uk) - Type 2 7 kW · Wellington Circle
- [BMW Mini - John Clark Aberdeen and Tayside · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-bmw-mini-john-clark-aberdeen-and-tayside-uk) - Type 2 7 kW · BMW Mini dealer - John Clark Aberdeen, Balmor · From 65p/kWh
- [Kincorth Library · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-kincorth-library-uk) - Type 2 22 kW · 247A Kincorth Circle
- [Faulbs Row Car Park · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-faulbs-row-car-park-uk) - Type 2 22 kW · Faulbs Row

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/chargeplace-scotland-hydrogen-centre-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 9 May 2020).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
