# In-Site Property Solutions · Chargeplace Scotland

Web page: https://ampmap.co.uk/charger/chargeplace-scotland-in-site-property-solutions-uk

In-Site Property Solutions is an EV charging site in Motherwell, North Lanarkshire, run by Chargeplace Scotland. Both of its sockets are 7 kW Type 2, and charging is listed as free.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Flemmington Industrial Park, ML1 2NT
- **Area:** Motherwell, North Lanarkshire, United Kingdom
- **Coordinates (latitude, longitude):** 55.78283, -3.96422

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 2 | Not listed |

- **Price:** Free (from Open Charge Map)

## Site information

- **Operator:** Chargeplace Scotland
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at In-Site Property Solutions (Chargeplace Scotland)?

The listed price is Free. Prices can change, so check the price at the charger before you start.

### How fast is charging at In-Site Property Solutions (Chargeplace Scotland)?

Up to 7 kW AC via Type 2.

### How many charging sockets does In-Site Property Solutions (Chargeplace Scotland) have?

2 charging sockets: 2 × 7 kW Type 2.

### Who operates In-Site Property Solutions?

In-Site Property Solutions is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.

### How long does a Tesla Model Y Long Range take to charge at In-Site Property Solutions (Chargeplace Scotland)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at In-Site Property Solutions (Chargeplace Scotland)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at In-Site Property Solutions (Chargeplace Scotland)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Motherwell](https://ampmap.co.uk/chargers/united-kingdom/north-lanarkshire/motherwell)
- [Chargeplace Scotland chargers](https://ampmap.co.uk/networks/chargeplace-scotland)

## Chargers near this site

- [Motherwell College · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-motherwell-college-uk) - Type 2 7 kW · Enterprise Way
- [Tim Hortons · E.ON Drive](https://ampmap.co.uk/charger/e-on-drive-tim-hortons-2-uk) - CCS 200 kW · 504 Windmillhill Street
- [Ravenscraig Sports Centre · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-ravenscraig-sports-centre-uk) - Type 2 22 kW · 1 O'Donnell Way
- [Ravernscraig Sports Centre · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-ravernscraig-sports-centre-uk) - Type 2 22 kW · New Craig Road.
- [Burger King, Wishaw · Osprey Charging](https://ampmap.co.uk/charger/osprey-charging-burger-king-uk) - CCS 75 kW, CHAdeMO 50 kW · 499 Glasgow Rd · From 89p/kWh
- [Raven's Cliff, Wishaw · Osprey Charging](https://ampmap.co.uk/charger/osprey-charging-raven-s-cliff-wishaw-uk) - CCS 150 kW · Prospect Hill Road · From 89p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/chargeplace-scotland-in-site-property-solutions-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 26 Jul 2018).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
