Chargeplace Scotland · EV charging site
Integrated Environmental Solutions LTD
IES Helix Building, Bearsden, G20 0SP
Integrated Environmental Solutions LTD is an EV charging site in Bearsden, East Dunbartonshire, run by Chargeplace Scotland. Both of its sockets are 7 kW Type 2, and charging is listed as free. 2 other charging sites are listed within a mile, and the nearest site with 50 kW or more is West End SF Connect (BP Pulse), 1.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargeplace Scotland
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- Free(from Open Charge Map, 9 Aug 2022)
- Phone (from Open Charge Map)
- 0141 648 0750
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Integrated Environmental Solutions LTD (Chargeplace Scotland)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Integrated Environmental Solutions LTD (Chargeplace Scotland)?
Up to 7 kW AC via Type 2.
How many charging sockets does Integrated Environmental Solutions LTD (Chargeplace Scotland) have?
2 charging sockets: 2 × 7 kW Type 2.
Who operates Integrated Environmental Solutions LTD?
Integrated Environmental Solutions LTD is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.
Where is the nearest charger with 50 kW or more to Integrated Environmental Solutions LTD (Chargeplace Scotland)?
West End SF Connect (BP Pulse) is 1.2 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Integrated Environmental Solutions LTD (Chargeplace Scotland)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Integrated Environmental Solutions LTD (Chargeplace Scotland)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Integrated Environmental Solutions LTD (Chargeplace Scotland)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Sepa Glasgow
- Glasgow Club Milton
- Glasgow Clyde College, Anniesland Campus, Glasgow
- West End SF Connect
- Pod Point Tesco Extra - Glasgow Maryhill
- Douglas Place
- Cheapest nearby
- Pod Point Tesco Extra - Glasgow Maryhill · 44.4p per kWh · 7 kW · 1.4 mi
- Fastest nearby
- West End SF Connect · 150 kW · 1.2 mi