Chargeplace Scotland · EV charging site
Inverkeithing Railway Station Car Park
Chapel Place, Dunfermline, KY11 1NJ
Inverkeithing Railway Station Car Park is an EV charging site in Dunfermline, Fife, run by Chargeplace Scotland. Both of its sockets are 7 kW Type 2. 2 other charging sites are listed within a mile, and the nearest site with 50 kW or more is St Davids SF Connect (BP Pulse), 1.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargeplace Scotland
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 0141 648 0750
- Getting there
- Post owner: Fife Council
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Inverkeithing Railway Station Car Park (Chargeplace Scotland)?
Up to 7 kW AC via Type 2.
How many charging sockets does Inverkeithing Railway Station Car Park (Chargeplace Scotland) have?
2 charging sockets: 1 × 7 kW Type 2, 1 × 7 kW Type 2.
Who operates Inverkeithing Railway Station Car Park?
Inverkeithing Railway Station Car Park is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.
Where is the nearest charger with 50 kW or more to Inverkeithing Railway Station Car Park (Chargeplace Scotland)?
St Davids SF Connect (BP Pulse) is 1.2 miles away in a straight line, with up to 300 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Inverkeithing Railway Station Car Park (Chargeplace Scotland)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Inverkeithing Railway Station Car Park (Chargeplace Scotland)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Inverkeithing Railway Station Car Park (Chargeplace Scotland)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Inverkeithing Rail Station (Top) Car Park
- Ferrytoll Park and Ride
- St Davids SF Connect
- Dalgety Bay Rail Halt Car Park
- Rosyth Rail Halt Car Park
- Gulf Station Rosyth
- Fastest nearby
- St Davids SF Connect · 300 kW · 1.2 mi