Chargeplace Scotland · EV charging site
James Watt Dock Marina
East Hamilton Street, Greenock, PA15 2UT
James Watt Dock Marina is an EV charging site at East Hamilton Street in Greenock, Inverclyde, run by Chargeplace Scotland. Its 2 sockets reach up to 50 kW, with CCS and CHAdeMO at the top speed. Amp Map lists 1 other charge point named James Watt Dock Marina in Greenock. 7 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is James Watt Dock Marina (Chargeplace Scotland), 60 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargeplace Scotland
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.15/kWh;min £1.00(from Open Charge Map, 6 May 2020)
- Phone (from Open Charge Map)
- 0141 648 0750
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at James Watt Dock Marina (Chargeplace Scotland)?
The listed price is £0.15/kWh;min £1.00. Prices can change, so check the price at the charger before you start.
How fast is charging at James Watt Dock Marina (Chargeplace Scotland)?
Up to 50 kW DC via CCS, CHAdeMO, Type 2.
How many charging sockets does James Watt Dock Marina (Chargeplace Scotland) have?
2 charging sockets: 1 × 50 kW CCS, 1 × 50 kW CHAdeMO, 1 × 43 kW Type 2, 2 × 22 kW Type 2.
Who operates James Watt Dock Marina?
James Watt Dock Marina is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.
Where is the nearest other charger with 50 kW or more to James Watt Dock Marina (Chargeplace Scotland)?
James Watt Dock Marina (Chargeplace Scotland) is 60 yards away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at James Watt Dock Marina (Chargeplace Scotland)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at James Watt Dock Marina (Chargeplace Scotland)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at James Watt Dock Marina (Chargeplace Scotland)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- James Watt Dock Marina
- Inverclyde Council Depot
- Pottery Street
- IONITY GmbH IONITY Greenock
- Pod Point HIEX Greenock
- Greenock (Holiday Inn)
- Cheapest nearby
- Pod Point HIEX Greenock · 34.8p per kWh · 7 kW · 0.7 mi
- Fastest nearby
- Greenock (Holiday Inn) · 400 kW · 0.7 mi