Chargeplace Scotland · EV charging site
Johnstone Town Hall, Johnstone
25 Church Street, Johnstone, PA5 8FA
Johnstone Town Hall, Johnstone is an EV charging site in Johnstone, Renfrewshire, run by Chargeplace Scotland. Its 2 sockets reach up to 50 kW, with CCS and CHAdeMO at the top speed, and charging is listed as free. 5 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Johnstone Town Hall (Chargeplace Scotland), 70 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargeplace Scotland
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- Free(from Open Charge Map, 2 Feb 2020)
- Phone (from Open Charge Map)
- 0141 648 0750
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Johnstone Town Hall, Johnstone (Chargeplace Scotland)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Johnstone Town Hall, Johnstone (Chargeplace Scotland)?
Up to 50 kW DC via Type 2, CCS, CHAdeMO.
How many charging sockets does Johnstone Town Hall, Johnstone (Chargeplace Scotland) have?
2 charging sockets: 2 × 22 kW Type 2, 1 × 43 kW Type 2, 1 × 50 kW CCS, 1 × 50 kW CHAdeMO.
Who operates Johnstone Town Hall, Johnstone?
Johnstone Town Hall, Johnstone is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.
Where is the nearest other charger with 50 kW or more to Johnstone Town Hall, Johnstone (Chargeplace Scotland)?
Johnstone Town Hall (Chargeplace Scotland) is 70 yards away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Johnstone Town Hall, Johnstone (Chargeplace Scotland)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Johnstone Town Hall, Johnstone (Chargeplace Scotland)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Johnstone Town Hall, Johnstone (Chargeplace Scotland)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.