Chargeplace Scotland · EV charging site
Kca Deutag Drilling LTD
Bankhead Drive, Nigg, AB12 4XX
Kca Deutag Drilling LTD is an EV charging site in Nigg, Aberdeen City, run by Chargeplace Scotland. All 4 of its sockets are 7 kW Type 2, and charging is listed as free. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Premier inn Aberdeen South (Portlethen) (GeniePoint), 1.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargeplace Scotland
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- Free(from Open Charge Map, 12 Apr 2020)
- Phone (from Open Charge Map)
- 0141 648 0750
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Kca Deutag Drilling LTD (Chargeplace Scotland)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Kca Deutag Drilling LTD (Chargeplace Scotland)?
Up to 7 kW AC via Type 2.
How many charging sockets does Kca Deutag Drilling LTD (Chargeplace Scotland) have?
4 charging sockets: 4 × 7 kW Type 2.
Who operates Kca Deutag Drilling LTD?
Kca Deutag Drilling LTD is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.
Where is the nearest charger with 50 kW or more to Kca Deutag Drilling LTD (Chargeplace Scotland)?
Premier inn Aberdeen South (Portlethen) (GeniePoint) is 1.2 miles away in a straight line, with up to 60 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Kca Deutag Drilling LTD (Chargeplace Scotland)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Kca Deutag Drilling LTD (Chargeplace Scotland)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Kca Deutag Drilling LTD (Chargeplace Scotland)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Premier inn Aberdeen South (Portlethen)
- Muirend Road - Portlethen
- BMW Mini - John Clark Aberdeen and Tayside
- Nissan Specialist Cars
- Hydrogen Centre
- Shell Redmoss
- Cheapest nearby
- Muirend Road - Portlethen · 65p per kWh · 200 kW · 1.3 mi
- Fastest nearby
- Muirend Road - Portlethen · 200 kW · 1.3 mi