Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Chargeplace Scotland · EV charging site

Keith Resource Centre

The Institute, 138-140 Mid Street, Keith, AB55 5BJ

Keith Resource Centre is an EV charging site in Keith, Moray, run by Chargeplace Scotland. Both of its sockets are 7 kW Type 2. 4 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Reidhaven Square, Keith (Chargeplace Scotland), 0.2 miles away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 19 Jul 2021Last verified 19 Jul 2021

Connectors

Type 2 · 7 kW2 connectors

Site information

Opening hours
Not published
Access
Customers only
Phone (from Open Charge Map)
0141 648 0750

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at Keith Resource Centre (Chargeplace Scotland)?

Up to 7 kW AC via Type 2.

How many charging sockets does Keith Resource Centre (Chargeplace Scotland) have?

2 charging sockets: 2 × 7 kW Type 2.

Who operates Keith Resource Centre?

Keith Resource Centre is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.

Can anyone charge at Keith Resource Centre (Chargeplace Scotland)?

The operator lists this charger for customers of the site.

Where is the nearest charger with 50 kW or more to Keith Resource Centre (Chargeplace Scotland)?

Reidhaven Square, Keith (Chargeplace Scotland) is 0.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Keith Resource Centre (Chargeplace Scotland)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Keith Resource Centre (Chargeplace Scotland)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Keith Resource Centre (Chargeplace Scotland)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 19 Jul 2021

Amp Map does not take payment. You pay the operator.