Chargeplace Scotland · EV charging site
Kenmure Street (Albert Drive)
Albert Drive, Glasgow, G41 2NJ
Kenmure Street (Albert Drive) is an EV charging site in Glasgow, Glasgow City, run by Chargeplace Scotland. Its 2 sockets reach up to 22 kW, with Type 2 at the top speed. 16 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Arnold Clark Glasgow Kilburnie Street Vanstore (Arnold Clark Dealer Network), 0.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargeplace Scotland
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Phone (from Open Charge Map)
- 0141 648 0750
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Kenmure Street (Albert Drive) (Chargeplace Scotland)?
Up to 22 kW AC via Type 2.
How many charging sockets does Kenmure Street (Albert Drive) (Chargeplace Scotland) have?
2 charging sockets: 1 × 22 kW Type 2, 1 × 7 kW Type 2.
Who operates Kenmure Street (Albert Drive)?
Kenmure Street (Albert Drive) is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.
Where is the nearest charger with 50 kW or more to Kenmure Street (Albert Drive) (Chargeplace Scotland)?
Arnold Clark Glasgow Kilburnie Street Vanstore (Arnold Clark Dealer Network) is 0.4 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Kenmure Street (Albert Drive) (Chargeplace Scotland)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Kenmure Street (Albert Drive) (Chargeplace Scotland)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Kenmure Street (Albert Drive) (Chargeplace Scotland)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.