Chargeplace Scotland · EV charging site
Kilncraigs Car Park
Greenside Street, Alloa, FK10 1EB
Kilncraigs Car Park is an EV charging site in Alloa, Clackmannanshire, run by Chargeplace Scotland. All 6 of its sockets are 7 kW Type 2, and charging is listed as free. 9 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Council Offices, Alloa (Chargeplace Scotland), 90 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargeplace Scotland
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- Free(from Open Charge Map, 16 Apr 2020)
- Phone (from Open Charge Map)
- 0141 648 0750
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Kilncraigs Car Park (Chargeplace Scotland)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Kilncraigs Car Park (Chargeplace Scotland)?
Up to 7 kW AC via Type 2.
How many charging sockets does Kilncraigs Car Park (Chargeplace Scotland) have?
6 charging sockets: 6 × 7 kW Type 2.
Who operates Kilncraigs Car Park?
Kilncraigs Car Park is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.
Where is the nearest charger with 50 kW or more to Kilncraigs Car Park (Chargeplace Scotland)?
Council Offices, Alloa (Chargeplace Scotland) is 90 yards away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Kilncraigs Car Park (Chargeplace Scotland)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Kilncraigs Car Park (Chargeplace Scotland)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Kilncraigs Car Park (Chargeplace Scotland)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Council Offices, Alloa
- Greenside Street Car Park, Alloa (1)
- Pod Point Tesco Extra - Alloa
- Greenside Street Car Park
- Forth Valley College - Alloa Campus
- King Street Car Park, Alloa
- Cheapest nearby
- Pod Point Tesco Extra - Alloa · 44.4p per kWh · 7 kW · 90 yd
- Fastest nearby
- Council Offices, Alloa · 50 kW · 90 yd