# Lanark Railway Station, Lanark · Chargeplace Scotland

Web page: https://ampmap.co.uk/charger/chargeplace-scotland-lanark-railway-station-lanark-uk

Lanark Railway Station, Lanark is an EV charging site in Dalserf, South Lanarkshire, run by Chargeplace Scotland. Both of its sockets are 11 kW Type 2, and charging is listed as free.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Bannatyne Street, ML11 7JP
- **Area:** Dalserf, South Lanarkshire, United Kingdom
- **Coordinates (latitude, longitude):** 55.67295, -3.77160

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 11 kW | 2 | Not listed |

- **Price:** Free (from Open Charge Map)

## Site information

- **Operator:** Chargeplace Scotland
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Lanark Railway Station, Lanark (Chargeplace Scotland)?

The listed price is Free. Prices can change, so check the price at the charger before you start.

### How fast is charging at Lanark Railway Station, Lanark (Chargeplace Scotland)?

Up to 11 kW AC via Type 2.

### How many charging sockets does Lanark Railway Station, Lanark (Chargeplace Scotland) have?

2 charging sockets: 2 × 11 kW Type 2.

### Who operates Lanark Railway Station, Lanark?

Lanark Railway Station, Lanark is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.

### How long does a Tesla Model Y Long Range take to charge at Lanark Railway Station, Lanark (Chargeplace Scotland)?

A 10–80% charge takes about 5h 2m on the 11 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Lanark Railway Station, Lanark (Chargeplace Scotland)?

A 10–80% charge takes about 3h 38m on the 11 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Lanark Railway Station, Lanark (Chargeplace Scotland)?

A 10–80% charge takes about 4h 39m on the 11 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Dalserf](https://ampmap.co.uk/chargers/united-kingdom/south-lanarkshire/dalserf)
- [Chargeplace Scotland chargers](https://ampmap.co.uk/networks/chargeplace-scotland)

## Chargers near this site

- [Glebe Drive Car Park, Lanark (1) · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-glebe-drive-car-park-lanark-1-uk) - Type 2 7 kW · Glebe Drive
- [South Vennel, Lanark](https://ampmap.co.uk/charger/south-vennel-lanark-uk) - Type 2 8 kW · South Vennel
- [Pod Point Tesco Superstore - Lanark Gallowhill Road](https://ampmap.co.uk/charger/pod-point-tesco-superstore-lanark-gallowhill-road-uk) - Type 2 7 kW · Gallowhill Road · From 44.4p/kWh
- [Bernards Wynd Car Park, Lanark · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-bernards-wynd-car-park-lanark-uk) - Type 2 7 kW · Bernards Wynd
- [Lanark Filling Station · InstaVolt Ltd](https://ampmap.co.uk/charger/instavolt-ltd-lanark-filling-station-uk) - CCS 50 kW, CHAdeMO 50 kW · 30A West Port

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/chargeplace-scotland-lanark-railway-station-lanark-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 7 Nov 2019).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
