Chargeplace Scotland · EV charging site
Larkhall
7 McNeil Street, Larkhall, ML9 1ER
Larkhall is an EV charging site in Larkhall, South Lanarkshire, run by Chargeplace Scotland. Its 3 sockets reach up to 50 kW, with CHAdeMO and Type 2 at the top speed. 2 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Larkhall Park and Ride (Chargeplace Scotland), 120 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargeplace Scotland
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 0141 648 0750
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Larkhall (Chargeplace Scotland)?
Up to 50 kW DC via Type 2, CHAdeMO.
How many charging sockets does Larkhall (Chargeplace Scotland) have?
3 charging sockets: 1 × 43 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 50 kW Type 2.
Who operates Larkhall?
Larkhall is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.
Where is the nearest other charger with 50 kW or more to Larkhall (Chargeplace Scotland)?
Larkhall Park and Ride (Chargeplace Scotland) is 120 yards away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Larkhall (Chargeplace Scotland)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Larkhall (Chargeplace Scotland)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Larkhall (Chargeplace Scotland)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Larkhall Park and Ride
- Q&a Car Park, Caledonian Road, Larkhall
- Larkhall, UK
- NHS National Procurement
- Chatelherault Station, Hamilton
- Sika Wishaw 2
- Cheapest nearby
- Larkhall, UK · 61p per kWh · 250 kW · 1.5 mi
- Fastest nearby
- Larkhall, UK · 250 kW · 1.5 mi