Chargeplace Scotland · EV charging site
Lochgilphead: Lorne St Car Park
24 Poltalloch Street, Lochgilphead, PA31 8LP
Lochgilphead: Lorne St Car Park is an EV charging site in Lochgilphead, Argyll and Bute, run by Chargeplace Scotland. Its 3 sockets reach up to 50 kW, with CHAdeMO and Type 2 at the top speed. 3 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Lorne Street Car Park (Chargeplace Scotland), 70 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargeplace Scotland
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 0141 648 0750
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Lochgilphead: Lorne St Car Park (Chargeplace Scotland)?
Up to 50 kW DC via Type 2, CHAdeMO.
How many charging sockets does Lochgilphead: Lorne St Car Park (Chargeplace Scotland) have?
3 charging sockets: 1 × 43 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 50 kW Type 2.
Who operates Lochgilphead: Lorne St Car Park?
Lochgilphead: Lorne St Car Park is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.
Where is the nearest other charger with 50 kW or more to Lochgilphead: Lorne St Car Park (Chargeplace Scotland)?
Lorne Street Car Park (Chargeplace Scotland) is 70 yards away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Lochgilphead: Lorne St Car Park (Chargeplace Scotland)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Lochgilphead: Lorne St Car Park (Chargeplace Scotland)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Lochgilphead: Lorne St Car Park (Chargeplace Scotland)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Cheapest nearby
- Kilmory Industrial Estate - 0143 · 69p per kWh · 50 kW · 0.7 mi