# Lochgilphead: Lorne St Car Park · Chargeplace Scotland

Web page: https://ampmap.co.uk/charger/chargeplace-scotland-lochgilphead-lorne-st-car-park-uk

Lochgilphead: Lorne St Car Park is an EV charging site in Lochgilphead, Argyll and Bute, run by Chargeplace Scotland. Its 3 sockets reach up to 50 kW, with CHAdeMO and Type 2 at the top speed.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** 24 Poltalloch Street, PA31 8LP
- **Area:** Lochgilphead, Argyll and Bute, United Kingdom
- **Coordinates (latitude, longitude):** 56.03752, -5.43451

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CHAdeMO | 50 kW | 1 | Not listed |
| Type 2 | 50 kW | 1 | Not listed |
| Type 2 | 43 kW | 1 | Not listed |

## Site information

- **Operator:** Chargeplace Scotland
- **Opening hours:** Not published
- **Access:** Public

## Common questions

### How fast is charging at Lochgilphead: Lorne St Car Park (Chargeplace Scotland)?

Up to 50 kW DC via Type 2, CHAdeMO.

### How many charging sockets does Lochgilphead: Lorne St Car Park (Chargeplace Scotland) have?

3 charging sockets: 1 × 43 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 50 kW Type 2.

### Who operates Lochgilphead: Lorne St Car Park?

Lochgilphead: Lorne St Car Park is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.

### How long does a Tesla Model Y Long Range take to charge at Lochgilphead: Lorne St Car Park (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Lochgilphead: Lorne St Car Park (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Lochgilphead: Lorne St Car Park (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Lochgilphead](https://ampmap.co.uk/chargers/united-kingdom/argyll-and-bute/lochgilphead)
- [Chargeplace Scotland chargers](https://ampmap.co.uk/networks/chargeplace-scotland)

## Chargers near this site

- [Lorne Street Car Park · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-lorne-street-car-park-uk) - CCS 50 kW, CHAdeMO 50 kW · Lorne Street
- [Mid Argyll Swimming Pool · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-mid-argyll-swimming-pool-uk) - Type 2 22 kW · Oban Road
- [Kilmory Industrial Estate - 0143 · FOR EV](https://ampmap.co.uk/charger/for-ev-kilmory-industrial-estate-0143-uk) - CCS 50 kW · Kilmory Industrial Estate · From 69p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/chargeplace-scotland-lochgilphead-lorne-st-car-park-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 4 May 2023).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
