# Longniddry Railway Station, East Lothian · Chargeplace Scotland

Web page: https://ampmap.co.uk/charger/chargeplace-scotland-longniddry-railway-station-east-lothian-uk

Longniddry Railway Station, East Lothian is an EV charging site in Musselburgh, East Lothian, run by Chargeplace Scotland. Both of its sockets are 4 kW Type 2, and charging is listed as free.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Longniddry Railway Station, EH32 0LS
- **Area:** Musselburgh, East Lothian, United Kingdom
- **Coordinates (latitude, longitude):** 55.97652, -2.88833

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 4 kW | 2 | Not listed |

- **Price:** Free (from Open Charge Map)

## Site information

- **Operator:** Chargeplace Scotland
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Longniddry Railway Station, East Lothian (Chargeplace Scotland)?

The listed price is Free. Prices can change, so check the price at the charger before you start.

### How fast is charging at Longniddry Railway Station, East Lothian (Chargeplace Scotland)?

Up to 4 kW AC via Type 2.

### How many charging sockets does Longniddry Railway Station, East Lothian (Chargeplace Scotland) have?

2 charging sockets: 2 × 4 kW Type 2.

### Who operates Longniddry Railway Station, East Lothian?

Longniddry Railway Station, East Lothian is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.

### How long does a Tesla Model Y Long Range take to charge at Longniddry Railway Station, East Lothian (Chargeplace Scotland)?

A 10–80% charge takes about 13h 50m on the 4 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Longniddry Railway Station, East Lothian (Chargeplace Scotland)?

A 10–80% charge takes about 9h 59m on the 4 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Longniddry Railway Station, East Lothian (Chargeplace Scotland)?

A 10–80% charge takes about 12h 46m on the 4 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Musselburgh](https://ampmap.co.uk/chargers/united-kingdom/east-lothian/musselburgh)
- [Chargeplace Scotland chargers](https://ampmap.co.uk/networks/chargeplace-scotland)

## Chargers near this site

- [Lord Wemyss Trust – FGF](https://ampmap.co.uk/charger/lord-wemyss-trust-fgf-uk) - Type 2 7 kW · Longniddry Steading, Longniddry,
- [Community Centre, Longniddry · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-community-centre-longniddry-uk) - Type 2 7 kW · Community Centre
- [Elvingston Science Centre · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-elvingston-science-centre-2-uk) - Type 2 7 kW · Gladsmuir
- [Elvingston Science Centre · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-elvingston-science-centre-uk) - Type 2 7 kW · By Gladsmuir
- [Randall House, Macmerry · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-randall-house-macmerry-uk) - Type 2 22 kW · Randall House, Macmerry
- [East Lothian Council, Macmerry (1) · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-east-lothian-council-macmerry-1-uk) - BS1363 3 Pin 13 Amp 3 kW · Penston House

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/chargeplace-scotland-longniddry-railway-station-east-lothian-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 2 Apr 2020).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
