# Lorne Street Car Park · Chargeplace Scotland

Web page: https://ampmap.co.uk/charger/chargeplace-scotland-lorne-street-car-park-uk

Lorne Street Car Park is an EV charging site in Lochgilphead, Argyll and Bute, run by Chargeplace Scotland. Its 4 sockets reach up to 50 kW, with CCS and CHAdeMO at the top speed, and charging is listed as free.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Lorne Street, PA31 8LP
- **Area:** Lochgilphead, Argyll and Bute, United Kingdom
- **Coordinates (latitude, longitude):** 56.03787, -5.43529

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 50 kW | 1 | Not listed |
| CHAdeMO | 50 kW | 1 | Not listed |
| Type 2 | 43 kW | 1 | Not listed |

- **Price:** Free (from Open Charge Map)

## Site information

- **Operator:** Chargeplace Scotland
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Lorne Street Car Park (Chargeplace Scotland)?

The listed price is Free. Prices can change, so check the price at the charger before you start.

### How fast is charging at Lorne Street Car Park (Chargeplace Scotland)?

Up to 50 kW DC via CCS, CHAdeMO, Type 2.

### How many charging sockets does Lorne Street Car Park (Chargeplace Scotland) have?

4 charging sockets: 1 × 50 kW CCS, 1 × 50 kW CHAdeMO, 1 × 43 kW Type 2.

### Who operates Lorne Street Car Park?

Lorne Street Car Park is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.

### How long does a Tesla Model Y Long Range take to charge at Lorne Street Car Park (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Lorne Street Car Park (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Lorne Street Car Park (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Lochgilphead](https://ampmap.co.uk/chargers/united-kingdom/argyll-and-bute/lochgilphead)
- [Chargeplace Scotland chargers](https://ampmap.co.uk/networks/chargeplace-scotland)

## Chargers near this site

- [Lochgilphead: Lorne St Car Park · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-lochgilphead-lorne-st-car-park-uk) - CHAdeMO 50 kW, Type 2 50 kW · 24 Poltalloch Street
- [Mid Argyll Swimming Pool · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-mid-argyll-swimming-pool-uk) - Type 2 22 kW · Oban Road
- [Kilmory Industrial Estate - 0143 · FOR EV](https://ampmap.co.uk/charger/for-ev-kilmory-industrial-estate-0143-uk) - CCS 50 kW · Kilmory Industrial Estate · From 69p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/chargeplace-scotland-lorne-street-car-park-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 19 Mar 2020).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
