# Main Street Inverkip 22 KW · Chargeplace Scotland

Web page: https://ampmap.co.uk/charger/chargeplace-scotland-main-street-inverkip-22-kw-uk

Main Street Inverkip 22 KW is an EV charging site in Greenock, Inverclyde, run by Chargeplace Scotland. Both of its sockets are 22 kW Type 2, and charging is listed as free.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Main Street, PA16 0FZ
- **Area:** Greenock, Inverclyde, United Kingdom
- **Coordinates (latitude, longitude):** 55.91031, -4.86522

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 22 kW | 2 | Not listed |

- **Price:** Free (from Open Charge Map)

## Site information

- **Operator:** Chargeplace Scotland
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Main Street Inverkip 22 KW (Chargeplace Scotland)?

The listed price is Free. Prices can change, so check the price at the charger before you start.

### How fast is charging at Main Street Inverkip 22 KW (Chargeplace Scotland)?

Up to 22 kW AC via Type 2.

### How many charging sockets does Main Street Inverkip 22 KW (Chargeplace Scotland) have?

2 charging sockets: 2 × 22 kW Type 2.

### Who operates Main Street Inverkip 22 KW?

Main Street Inverkip 22 KW is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.

### How long does a Tesla Model Y Long Range take to charge at Main Street Inverkip 22 KW (Chargeplace Scotland)?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Main Street Inverkip 22 KW (Chargeplace Scotland)?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Main Street Inverkip 22 KW (Chargeplace Scotland)?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Greenock](https://ampmap.co.uk/chargers/united-kingdom/inverclyde/greenock)
- [Chargeplace Scotland chargers](https://ampmap.co.uk/networks/chargeplace-scotland)

## Chargers near this site

- [Main Road · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-main-road-uk) - CCS 50 kW, CHAdeMO 50 kW · Main Road
- [Sainsburys Inverkip - 0185 · FOR EV](https://ampmap.co.uk/charger/for-ev-sainsburys-inverkip-0185-uk) - CCS 100 kW, CHAdeMO 50 kW · 1 Kip Park, Main Street · From 69p/kWh
- [EVC Kip Marina · Roam Charging](https://ampmap.co.uk/charger/roam-charging-evc-kip-marina-uk) - Type 2 22 kW · The Yacht
- [Wemyss Bay Station · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-wemyss-bay-station-uk) - Type 2 22 kW, Type 2 7 kW · 11 Shore Road
- [Branchton SF Connect · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-branchton-sf-connect-uk) - CCS 150 kW, CHAdeMO 100 kW · Inverkip Road, Branchton
- [Dunoon: Coal Pier · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-dunoon-coal-pier-uk) - CHAdeMO 50 kW, Type 2 50 kW · 24 Argyll Street

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/chargeplace-scotland-main-street-inverkip-22-kw-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 2 Apr 2020).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
