Chargeplace Scotland · EV charging site
Mastrick Road Car Park
Mastrick Road, Aberdeen, AB16 5PY
Mastrick Road Car Park is an EV charging site in Aberdeen, Aberdeen City, run by Chargeplace Scotland. Both of its sockets are 22 kW Type 2, and charging is listed as free. 6 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Pod Point Tesco Superstore - Aberdeen Woodend, 0.6 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargeplace Scotland
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- Free(from Open Charge Map, 8 Oct 2019)
- Phone (from Open Charge Map)
- 0141 648 0750
- Notes
- CYC post 50960
- Getting there
- Available 24/7
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Mastrick Road Car Park (Chargeplace Scotland)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Mastrick Road Car Park (Chargeplace Scotland)?
Up to 22 kW AC via Type 2.
How many charging sockets does Mastrick Road Car Park (Chargeplace Scotland) have?
2 charging sockets: 2 × 22 kW Type 2.
Who operates Mastrick Road Car Park?
Mastrick Road Car Park is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.
Where is the nearest charger with 50 kW or more to Mastrick Road Car Park (Chargeplace Scotland)?
Pod Point Tesco Superstore - Aberdeen Woodend is 0.6 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Mastrick Road Car Park (Chargeplace Scotland)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Mastrick Road Car Park (Chargeplace Scotland)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Mastrick Road Car Park (Chargeplace Scotland)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Mastrick Housing Office
- Pod Point Tesco Superstore - Aberdeen Woodend
- Aberdeenshire Council Headquarters
- Woodhill House, Aberdeen
- Cornhill Shopping Arcade (Co-op)
- Aberdeen University, Institute of Medical Science
- Cheapest nearby
- Pod Point Tesco Superstore - Aberdeen Woodend · 44.4p per kWh · 50 kW · 0.6 mi
- Fastest nearby
- Pod Point Tesco Superstore - Aberdeen Woodend · 50 kW · 0.6 mi