# Newton Stewart Library · Chargeplace Scotland

Web page: https://ampmap.co.uk/charger/chargeplace-scotland-newton-stewart-library-uk

Newton Stewart Library is an EV charging site in Newton Stewart, Dumfries and Galloway, run by Chargeplace Scotland. Its 2 sockets reach up to 50 kW, with CHAdeMO and CCS at the top speed, and charging is listed as free.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Church Steet, DG8 6ER
- **Area:** Newton Stewart, Dumfries and Galloway, United Kingdom
- **Coordinates (latitude, longitude):** 54.95763, -4.48500

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 50 kW | 1 | Not listed |
| CHAdeMO | 50 kW | 1 | Not listed |
| Type 2 | 43 kW | 1 | Not listed |

- **Price:** Free (from Open Charge Map)

## Site information

- **Operator:** Chargeplace Scotland
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Newton Stewart Library (Chargeplace Scotland)?

The listed price is Free. Prices can change, so check the price at the charger before you start.

### How fast is charging at Newton Stewart Library (Chargeplace Scotland)?

Up to 50 kW DC via CHAdeMO, Type 2, CCS.

### How many charging sockets does Newton Stewart Library (Chargeplace Scotland) have?

2 charging sockets: 1 × 50 kW CHAdeMO, 1 × 43 kW Type 2, 1 × 50 kW CCS.

### Who operates Newton Stewart Library?

Newton Stewart Library is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.

### How long does a Tesla Model Y Long Range take to charge at Newton Stewart Library (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Newton Stewart Library (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Newton Stewart Library (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Newton Stewart](https://ampmap.co.uk/chargers/united-kingdom/dumfries-and-galloway/newton-stewart)
- [Chargeplace Scotland chargers](https://ampmap.co.uk/networks/chargeplace-scotland)

## Chargers near this site

- [Penningham Centre, Newton Stewart · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-penningham-centre-newton-stewart-uk) - Type 2 7 kW · Auchendoon Road
- [Swarco 7KW · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-swarco-7kw-uk) - Type 2 7 kW · Douglas Ewart High School
- [Creebridge Service Station · InstaVolt Ltd](https://ampmap.co.uk/charger/instavolt-ltd-creebridge-service-station-uk) - CCS 50 kW, CHAdeMO 50 kW · New Galloway Road

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/chargeplace-scotland-newton-stewart-library-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 9 Apr 2018).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
