Chargeplace Scotland · EV charging site
North Ness Council HQ
Mitchell's Road, Lerwick, ZE1 0NT
North Ness Council HQ is an EV charging site in Lerwick, Shetland Islands, run by Chargeplace Scotland. Both of its sockets are 7 kW Type 2, and charging is listed as free. 13 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Gilbertson Park (Chargeplace Scotland), 0.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargeplace Scotland
- Opening hours
- Not published
- Access
- Customers only
- Price
- Free(from Open Charge Map, 9 Apr 2018)
- Phone (from Open Charge Map)
- 0141 648 0750
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at North Ness Council HQ (Chargeplace Scotland)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at North Ness Council HQ (Chargeplace Scotland)?
Up to 7 kW AC via Type 2.
How many charging sockets does North Ness Council HQ (Chargeplace Scotland) have?
2 charging sockets: 2 × 7 kW Type 2.
Who operates North Ness Council HQ?
North Ness Council HQ is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.
Can anyone charge at North Ness Council HQ (Chargeplace Scotland)?
The operator lists this charger for customers of the site.
Where is the nearest charger with 50 kW or more to North Ness Council HQ (Chargeplace Scotland)?
Gilbertson Park (Chargeplace Scotland) is 0.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at North Ness Council HQ (Chargeplace Scotland)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at North Ness Council HQ (Chargeplace Scotland)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at North Ness Council HQ (Chargeplace Scotland)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- North Ness Council Offices
- Fort Road Car Park, Lerwick
- Albert Building, Lerwick
- ZE1 OLZ
- Victoria Pier, Lerwick
- Grantfield Offices
- Fastest nearby
- Albert Building, Lerwick · 22 kW · 0.3 mi