Chargeplace Scotland · EV charging site
Orchard Loan
St Margarets House, Dundee, DD8 1WH
Orchard Loan is an EV charging site in Dundee, Dundee City, run by Chargeplace Scotland. It has a single socket, with CCS and CHAdeMO at up to 50 kW, and charging is listed as free. 2 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Angus House (Chargeplace Scotland), 170 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargeplace Scotland
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- Free(from Open Charge Map, 3 Jun 2022)
- Phone (from Open Charge Map)
- 0141 648 0750
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Orchard Loan (Chargeplace Scotland)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Orchard Loan (Chargeplace Scotland)?
Up to 50 kW DC via CCS, CHAdeMO, Type 2.
How many charging sockets does Orchard Loan (Chargeplace Scotland) have?
1 charging socket: 4 × 50 kW CCS, 4 × 50 kW CHAdeMO, 4 × 43 kW Type 2, 6 × 22 kW Type 2.
Who operates Orchard Loan?
Orchard Loan is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.
Where is the nearest other charger with 50 kW or more to Orchard Loan (Chargeplace Scotland)?
Angus House (Chargeplace Scotland) is 170 yards away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Orchard Loan (Chargeplace Scotland)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Orchard Loan (Chargeplace Scotland)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Orchard Loan (Chargeplace Scotland)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Angus House
- Angus Council Unknown Location
- Chapelbank Hotel
- East Greens Car Park, Forfar
- Pod Point Tesco Superstore - Forfar Castle Street
- Forfar Filling Station
- Cheapest nearby
- Pod Point Tesco Superstore - Forfar Castle Street · 44.4p per kWh · 7 kW · 1.5 mi