# Orchard Loan · Chargeplace Scotland

Web page: https://ampmap.co.uk/charger/chargeplace-scotland-orchard-loan-uk

Orchard Loan is an EV charging site in Dundee, Dundee City, run by Chargeplace Scotland. It has a single socket, with CCS and CHAdeMO at up to 50 kW, and charging is listed as free.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** St Margarets House, DD8 1WH
- **Area:** Dundee, Dundee City, United Kingdom
- **Coordinates (latitude, longitude):** 56.63677, -2.92189

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 50 kW | 4 | Not listed |
| CHAdeMO | 50 kW | 4 | Not listed |
| Type 2 | 43 kW | 4 | Not listed |
| Type 2 | 22 kW | 6 | Not listed |

- **Price:** Free (from Open Charge Map)

## Site information

- **Operator:** Chargeplace Scotland
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Orchard Loan (Chargeplace Scotland)?

The listed price is Free. Prices can change, so check the price at the charger before you start.

### How fast is charging at Orchard Loan (Chargeplace Scotland)?

Up to 50 kW DC via CCS, CHAdeMO, Type 2.

### How many charging sockets does Orchard Loan (Chargeplace Scotland) have?

1 charging socket: 4 × 50 kW CCS, 4 × 50 kW CHAdeMO, 4 × 43 kW Type 2, 6 × 22 kW Type 2.

### Who operates Orchard Loan?

Orchard Loan is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.

### How long does a Tesla Model Y Long Range take to charge at Orchard Loan (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Orchard Loan (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Orchard Loan (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Dundee](https://ampmap.co.uk/chargers/united-kingdom/dundee-city/dundee)
- [Cheapest charging in Dundee](https://ampmap.co.uk/chargers/united-kingdom/dundee-city/dundee/cheapest)
- [Chargeplace Scotland chargers](https://ampmap.co.uk/networks/chargeplace-scotland)

## Chargers near this site

- [Angus House · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-angus-house-uk) - CCS 50 kW, CHAdeMO 50 kW · Orchardbank
- [Angus Council Unknown Location · Charge Your Car](https://ampmap.co.uk/charger/charge-your-car-angus-council-unknown-location-uk) - Type 2 7 kW · Angus Council Unknown Location
- [Chapelbank Hotel · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-chapelbank-hotel-uk) - Type 2 7 kW · 69 East High Street
- [East Greens Car Park, Forfar · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-east-greens-car-park-forfar-uk) - CCS 50 kW, CHAdeMO 50 kW · East Greens Car Park
- [Pod Point Tesco Superstore - Forfar Castle Street](https://ampmap.co.uk/charger/pod-point-tesco-superstore-forfar-castle-street-uk) - Type 2 7 kW · Castle Street · From 44.4p/kWh
- [Forfar Filling Station · InstaVolt Ltd](https://ampmap.co.uk/charger/instavolt-ltd-forfar-filling-station-uk) - CCS 50 kW, CHAdeMO 50 kW · 28 Kirkton Park

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/chargeplace-scotland-orchard-loan-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 3 Jun 2022).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
