# Peebles Golf Club · Chargeplace Scotland

Web page: https://ampmap.co.uk/charger/chargeplace-scotland-peebles-golf-club-uk

Peebles Golf Club is an EV charging site in Penicuik, Midlothian, run by Chargeplace Scotland. Both of its sockets are 22 kW Type 2, and charging is listed as free.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** 45 Kirkland Street, EH45 8EU
- **Area:** Penicuik, Midlothian, United Kingdom
- **Coordinates (latitude, longitude):** 55.65468, -3.19956

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 22 kW | 2 | Not listed |

- **Price:** Free (from Open Charge Map)

## Site information

- **Operator:** Chargeplace Scotland
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Peebles Golf Club (Chargeplace Scotland)?

The listed price is Free. Prices can change, so check the price at the charger before you start.

### How fast is charging at Peebles Golf Club (Chargeplace Scotland)?

Up to 22 kW AC via Type 2.

### How many charging sockets does Peebles Golf Club (Chargeplace Scotland) have?

2 charging sockets: 2 × 22 kW Type 2.

### Who operates Peebles Golf Club?

Peebles Golf Club is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.

### How long does a Tesla Model Y Long Range take to charge at Peebles Golf Club (Chargeplace Scotland)?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Peebles Golf Club (Chargeplace Scotland)?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Peebles Golf Club (Chargeplace Scotland)?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Penicuik](https://ampmap.co.uk/chargers/united-kingdom/midlothian/penicuik)
- [Chargeplace Scotland chargers](https://ampmap.co.uk/networks/chargeplace-scotland)

## Chargers near this site

- [Rosetta Road · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-rosetta-road-uk) - CCS 50 kW, CHAdeMO 50 kW · Scottish Borders Council
- [Rosetta Road, Peebles (1) · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-rosetta-road-peebles-1-uk) - BS1363 3 Pin 13 Amp 3 kW · Rosetta Road
- [Park Hotel · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-park-hotel-uk) - CCS 50 kW, CHAdeMO 50 kW · Innerleithen Road
- [Peebles SF Connect · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-peebles-sf-connect-uk) - CCS 150 kW · Innerleithen Rd
- [Peebles Hydro, Peebles · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-peebles-hydro-peebles-uk) - Type 2 22 kW · Peebles Hydro
- [Pod Point Forestry and Land Scotland - Glentress](https://ampmap.co.uk/charger/pod-point-forestry-and-land-scotland-glentress-2-uk) - Type 2 7 kW · Glentress Forest Innerleithen Road · From 60p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/chargeplace-scotland-peebles-golf-club-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 10 Oct 2019).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
