Chargeplace Scotland · EV charging site
Pier Road
Pier Road, Isle of Harris, HS3 3DG
Pier Road is an EV charging site in Isle of Harris, Eilean Siar, run by Chargeplace Scotland. Its 3 sockets reach up to 50 kW, with CHAdeMO and CCS at the top speed. 2 other charging sites are listed within a mile, and no other site with 50 kW or more is listed within 15 miles.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargeplace Scotland
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Phone (from Open Charge Map)
- 0141 648 0750
- Getting there
- Post owner: Caledonian Maritime Assets Ltd Access: 24 hours
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Pier Road (Chargeplace Scotland)?
Up to 50 kW DC via CHAdeMO, Type 2, CCS.
How many charging sockets does Pier Road (Chargeplace Scotland) have?
3 charging sockets: 1 × 50 kW CHAdeMO, 1 × 43 kW Type 2, 1 × 50 kW CCS.
Who operates Pier Road?
Pier Road is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.
Where is the nearest other charger with 50 kW or more to Pier Road (Chargeplace Scotland)?
Amp Map lists no other site with 50 kW or more within 15 miles in a straight line.
How long does a Tesla Model Y Long Range take to charge at Pier Road (Chargeplace Scotland)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pier Road (Chargeplace Scotland)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Pier Road (Chargeplace Scotland)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.