Chargeplace Scotland · EV charging site
Pillars of Hercules
A912, Glenrothes, KY15 7AD
Pillars of Hercules is an EV charging site in Glenrothes, Fife, run by Chargeplace Scotland. Both of its sockets are 7 kW Type 2, and charging is listed as free. 1 other charging site is listed within a mile, and the nearest site with 50 kW or more is Shell Garage (InstaVolt Ltd), 4.9 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargeplace Scotland
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- Free(from Open Charge Map, 10 Feb 2019)
- Phone (from Open Charge Map)
- 0141 648 0750
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Pillars of Hercules (Chargeplace Scotland)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Pillars of Hercules (Chargeplace Scotland)?
Up to 7 kW AC via Type 2.
How many charging sockets does Pillars of Hercules (Chargeplace Scotland) have?
2 charging sockets: 2 × 7 kW Type 2.
Who operates Pillars of Hercules?
Pillars of Hercules is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.
Where is the nearest charger with 50 kW or more to Pillars of Hercules (Chargeplace Scotland)?
Shell Garage (InstaVolt Ltd) is 4.9 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Pillars of Hercules (Chargeplace Scotland)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pillars of Hercules (Chargeplace Scotland)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Pillars of Hercules (Chargeplace Scotland)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.