Chargeplace Scotland · EV charging site
Railway Car Park, Pitgaveny Street, Lossiemouth.
6A Clifton Road, Elgin, IV31 6JN
Railway Car Park, Pitgaveny Street, Lossiemouth. is an EV charging site in Elgin, Moray, run by Chargeplace Scotland. Both of its sockets are 22 kW Type 2. 1 other charging site is listed within a mile, and the nearest site with 50 kW or more is Pod Point Tesco Extra - Elgin, 5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargeplace Scotland
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 0141 648 0750
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Railway Car Park, Pitgaveny Street, Lossiemouth. (Chargeplace Scotland)?
Up to 22 kW AC via Type 2.
How many charging sockets does Railway Car Park, Pitgaveny Street, Lossiemouth. (Chargeplace Scotland) have?
2 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2.
Who operates Railway Car Park, Pitgaveny Street, Lossiemouth.?
Railway Car Park, Pitgaveny Street, Lossiemouth. is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.
Where is the nearest charger with 50 kW or more to Railway Car Park, Pitgaveny Street, Lossiemouth. (Chargeplace Scotland)?
Pod Point Tesco Extra - Elgin is 5 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Railway Car Park, Pitgaveny Street, Lossiemouth. (Chargeplace Scotland)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Railway Car Park, Pitgaveny Street, Lossiemouth. (Chargeplace Scotland)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Railway Car Park, Pitgaveny Street, Lossiemouth. (Chargeplace Scotland)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.