# Ravenswood Pitches · Chargeplace Scotland

Web page: https://ampmap.co.uk/charger/chargeplace-scotland-ravenswood-pitches-uk

Ravenswood Pitches is an EV charging site in Cumbernauld, North Lanarkshire, run by Chargeplace Scotland. It has a single socket, with CCS and CHAdeMO at up to 50 kW.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Dowanfield Road, G67 1LA
- **Area:** Cumbernauld, North Lanarkshire, United Kingdom
- **Coordinates (latitude, longitude):** 55.94530, -4.00355

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 50 kW | 1 | Not listed |
| CHAdeMO | 50 kW | 1 | Not listed |
| Type 2 | 43 kW | 1 | Not listed |

## Site information

- **Operator:** Chargeplace Scotland
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How fast is charging at Ravenswood Pitches (Chargeplace Scotland)?

Up to 50 kW DC via CCS, CHAdeMO, Type 2.

### How many charging sockets does Ravenswood Pitches (Chargeplace Scotland) have?

1 charging socket: 1 × 50 kW CCS, 1 × 50 kW CHAdeMO, 1 × 43 kW Type 2.

### Who operates Ravenswood Pitches?

Ravenswood Pitches is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.

### How long does a Tesla Model Y Long Range take to charge at Ravenswood Pitches (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Ravenswood Pitches (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Ravenswood Pitches (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Cumbernauld](https://ampmap.co.uk/chargers/united-kingdom/north-lanarkshire/cumbernauld)
- [Chargeplace Scotland chargers](https://ampmap.co.uk/networks/chargeplace-scotland)

## Chargers near this site

- [The Red Deer · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-the-red-deer-uk) - CCS / CHAdeMO 50 kW · The Red Deer, Auchenkilns Park, Cumbernauld · From 89p/kWh
- [Antonine Shopping Centre - 0115 · FOR EV](https://ampmap.co.uk/charger/for-ev-antonine-shopping-centre-0115-uk) - CCS 50 kW, Type 2 22 kW · Antonine Shopping Centre, Tryst Road · From 65p/kWh
- [Bron Way Car Park · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-bron-way-car-park-uk) - Type 2 7 kW · Bron Way
- [Greenfaulds Park & Ride, Cumbernauld · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-greenfaulds-park-and-ride-cumbernauld-uk) - Type 2 7 kW · Lenziemill Road
- [Craiglinn SF Connect · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-craiglinn-sf-connect-uk) - CCS 150 kW, CHAdeMO 100 kW · Craiglinn Park Road
- [S Carbrain Road · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-s-carbrain-road-uk) - Type 2 22 kW · Cumbernauld

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/chargeplace-scotland-ravenswood-pitches-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 6 Jul 2021).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
