Chargeplace Scotland · EV charging site
RBS Headquarters, Edinburgh
RBS Headquarters, Broxburn, EH12 9SB
RBS Headquarters, Edinburgh is an EV charging site in Broxburn, West Lothian, run by Chargeplace Scotland. It has a single 7 kW Type 2 socket, and charging is listed as free. 6 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Ingliston Park & Ride (Chargeplace Scotland), 0.6 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargeplace Scotland
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- Free(from Open Charge Map, 8 Mar 2020)
- Phone (from Open Charge Map)
- 0141 648 0750
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at RBS Headquarters, Edinburgh (Chargeplace Scotland)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at RBS Headquarters, Edinburgh (Chargeplace Scotland)?
Up to 7 kW AC via Type 2.
How many charging sockets does RBS Headquarters, Edinburgh (Chargeplace Scotland) have?
1 charging socket: 1 × 7 kW Type 2.
Who operates RBS Headquarters, Edinburgh?
RBS Headquarters, Edinburgh is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.
Where is the nearest charger with 50 kW or more to RBS Headquarters, Edinburgh (Chargeplace Scotland)?
Ingliston Park & Ride (Chargeplace Scotland) is 0.6 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at RBS Headquarters, Edinburgh (Chargeplace Scotland)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at RBS Headquarters, Edinburgh (Chargeplace Scotland)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at RBS Headquarters, Edinburgh (Chargeplace Scotland)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Ingliston Park & Ride
- Ingliston Park & Ride Rapid
- Ingliston Park & Ride 1
- Edinburgh, Edinburgh Business Park
- Science and Advice for Scottish Agriculture (SASA)
- Ingliston SF Connect
- Cheapest nearby
- Edinburgh, Edinburgh Business Park · 90p per kWh · 160 kW · 0.8 mi
- Fastest nearby
- Edinburgh, Edinburgh Business Park · 160 kW · 0.8 mi