# RBS Headquarters, Edinburgh · Chargeplace Scotland

Web page: https://ampmap.co.uk/charger/chargeplace-scotland-rbs-headquarters-edinburgh-uk

RBS Headquarters, Edinburgh is an EV charging site in Broxburn, West Lothian, run by Chargeplace Scotland. It has a single 7 kW Type 2 socket, and charging is listed as free.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** RBS Headquarters, EH12 9SB
- **Area:** Broxburn, West Lothian, United Kingdom
- **Coordinates (latitude, longitude):** 55.93619, -3.34036

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 1 | Not listed |

- **Price:** Free (from Open Charge Map)

## Site information

- **Operator:** Chargeplace Scotland
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at RBS Headquarters, Edinburgh (Chargeplace Scotland)?

The listed price is Free. Prices can change, so check the price at the charger before you start.

### How fast is charging at RBS Headquarters, Edinburgh (Chargeplace Scotland)?

Up to 7 kW AC via Type 2.

### How many charging sockets does RBS Headquarters, Edinburgh (Chargeplace Scotland) have?

1 charging socket: 1 × 7 kW Type 2.

### Who operates RBS Headquarters, Edinburgh?

RBS Headquarters, Edinburgh is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.

### How long does a Tesla Model Y Long Range take to charge at RBS Headquarters, Edinburgh (Chargeplace Scotland)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at RBS Headquarters, Edinburgh (Chargeplace Scotland)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at RBS Headquarters, Edinburgh (Chargeplace Scotland)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Broxburn](https://ampmap.co.uk/chargers/united-kingdom/west-lothian/broxburn)
- [Chargeplace Scotland chargers](https://ampmap.co.uk/networks/chargeplace-scotland)

## Chargers near this site

- [Ingliston Park & Ride · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-ingliston-park-and-ride-uk) - CCS 50 kW, CHAdeMO 50 kW · 2 East Field Road
- [Ingliston Park & Ride Rapid · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-ingliston-park-and-ride-rapid-uk) - CHAdeMO 50 kW, Type 2 50 kW · 49 Eastfield Road
- [Ingliston Park & Ride 1 · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-ingliston-park-and-ride-1-uk) - Type 2 22 kW · 49 Eastfield Road
- [Edinburgh, Edinburgh Business Park · Source EV](https://ampmap.co.uk/charger/source-ev-uk-edinburgh-edinburgh-business-park-uk) - CCS 160 kW, CCS 150 kW · Lochside View · From 90p/kWh
- [Science and Advice for Scottish Agriculture (SASA) · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-science-and-advice-for-scottish-agriculture-sasa-uk) - Type 2 7 kW · Roddinglaw Road
- [Ingliston SF Connect · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-ingliston-sf-connect-uk) - CCS 150 kW · Glasgow Road, Newbridge

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/chargeplace-scotland-rbs-headquarters-edinburgh-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 8 Mar 2020).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
