# Reston Railway Station · Chargeplace Scotland

Web page: https://ampmap.co.uk/charger/chargeplace-scotland-reston-railway-station-uk

Reston Railway Station is an EV charging site in Chirnside, The Scottish Borders, run by Chargeplace Scotland. All 12 of its sockets are 7 kW Type 2, and charging is listed as free.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** The Orchard, TD14 5JT
- **Area:** Chirnside, The Scottish Borders, United Kingdom
- **Coordinates (latitude, longitude):** 55.85035, -2.19269

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 12 | Not listed |

- **Price:** Free (from Open Charge Map)

## Site information

- **Operator:** Chargeplace Scotland
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required
- **Notes:** Funded by Transport Scotland

## Common questions

### How much does it cost to charge at Reston Railway Station (Chargeplace Scotland)?

The listed price is Free. Prices can change, so check the price at the charger before you start.

### How fast is charging at Reston Railway Station (Chargeplace Scotland)?

Up to 7 kW AC via Type 2.

### How many charging sockets does Reston Railway Station (Chargeplace Scotland) have?

12 charging sockets: 2 × 7 kW Type 2, 2 × 7 kW Type 2, 2 × 7 kW Type 2, 2 × 7 kW Type 2, 2 × 7 kW Type 2, 2 × 7 kW Type 2.

### Who operates Reston Railway Station?

Reston Railway Station is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.

### How long does a Tesla Model Y Long Range take to charge at Reston Railway Station (Chargeplace Scotland)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Reston Railway Station (Chargeplace Scotland)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Reston Railway Station (Chargeplace Scotland)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Chirnside](https://ampmap.co.uk/chargers/united-kingdom/the-scottish-borders/chirnside)
- [Chargeplace Scotland chargers](https://ampmap.co.uk/networks/chargeplace-scotland)

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/chargeplace-scotland-reston-railway-station-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 26 May 2022).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
