Chargeplace Scotland · EV charging site
Rivendell Care
Oak Road, Dunkeld, PH8 0BL
Rivendell Care is an EV charging site in Dunkeld, Perth and Kinross, run by Chargeplace Scotland. Both of its sockets are 7 kW Type 2. 1 other charging site is listed within a mile, and the nearest site with 50 kW or more is Atholl Street Car Park (Chargeplace Scotland), 0.6 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargeplace Scotland
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Phone (from Open Charge Map)
- 0141 648 0750
- Getting there
- Post owner: Rivendell Care
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Rivendell Care (Chargeplace Scotland)?
Up to 7 kW AC via Type 2.
How many charging sockets does Rivendell Care (Chargeplace Scotland) have?
2 charging sockets: 1 × 7 kW Type 2, 1 × 7 kW Type 2.
Who operates Rivendell Care?
Rivendell Care is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.
Where is the nearest charger with 50 kW or more to Rivendell Care (Chargeplace Scotland)?
Atholl Street Car Park (Chargeplace Scotland) is 0.6 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Rivendell Care (Chargeplace Scotland)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Rivendell Care (Chargeplace Scotland)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Rivendell Care (Chargeplace Scotland)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Fastest nearby
- Atholl Street Car Park · 50 kW · 0.6 mi