# Riverside Car Park · Chargeplace Scotland

Web page: https://ampmap.co.uk/charger/chargeplace-scotland-riverside-car-park-uk

Riverside Car Park is an EV charging site in Balfron, Stirling, run by Chargeplace Scotland. Its 2 sockets reach up to 50 kW, with CCS and CHAdeMO at the top speed, and charging is listed as free.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Manse Road, FK8 3UG
- **Area:** Balfron, Stirling, United Kingdom
- **Coordinates (latitude, longitude):** 56.17811, -4.38428

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 50 kW | 1 | Not listed |
| CHAdeMO | 50 kW | 1 | Not listed |
| Type 2 | 43 kW | 1 | Not listed |

- **Price:** Free (from Open Charge Map)

## Site information

- **Operator:** Chargeplace Scotland
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Riverside Car Park (Chargeplace Scotland)?

The listed price is Free. Prices can change, so check the price at the charger before you start.

### How fast is charging at Riverside Car Park (Chargeplace Scotland)?

Up to 50 kW DC via CCS, CHAdeMO, Type 2.

### How many charging sockets does Riverside Car Park (Chargeplace Scotland) have?

2 charging sockets: 1 × 50 kW CCS, 1 × 50 kW CHAdeMO, 1 × 43 kW Type 2.

### Who operates Riverside Car Park?

Riverside Car Park is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.

### How long does a Tesla Model Y Long Range take to charge at Riverside Car Park (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Riverside Car Park (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Riverside Car Park (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Balfron](https://ampmap.co.uk/chargers/united-kingdom/stirling/balfron)
- [Chargeplace Scotland chargers](https://ampmap.co.uk/networks/chargeplace-scotland)

## Chargers near this site

- [Cobleland Campsite · Go Zero](https://ampmap.co.uk/charger/go-zero-cobleland-campsite-uk) - Type 2 7 kW · Cobleland Caravan & Camping Site
- [Steamship Walter Scott · Go Zero](https://ampmap.co.uk/charger/go-zero-steamship-walter-scott-uk) - CCS 30 kW, Type 2 22 kW · Steamship Walter Scott
- [Pod Point Loch Venachar Lodges - Coorie](https://ampmap.co.uk/charger/pod-point-loch-venachar-lodges-uk) - Type 2 7 kW · Coorie Nr Callander · From 64.8p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/chargeplace-scotland-riverside-car-park-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 23 Sept 2019).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
