# Rothesay, Isle of Bute · Chargeplace Scotland

Web page: https://ampmap.co.uk/charger/chargeplace-scotland-rothesay-isle-of-bute-uk

Rothesay, Isle of Bute is an EV charging site in Isle of Bute, Argyll and Bute, run by Chargeplace Scotland. Both of its sockets are 22 kW Type 2, and charging is listed as free.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Rothesay, Isle of Bute, PA20 0DY
- **Area:** Isle of Bute, Argyll and Bute, United Kingdom
- **Coordinates (latitude, longitude):** 55.83207, -5.06207

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 22 kW | 2 | Not listed |

- **Price:** Free (from Open Charge Map)

## Site information

- **Operator:** Chargeplace Scotland
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Rothesay, Isle of Bute (Chargeplace Scotland)?

The listed price is Free. Prices can change, so check the price at the charger before you start.

### How fast is charging at Rothesay, Isle of Bute (Chargeplace Scotland)?

Up to 22 kW AC via Type 2.

### How many charging sockets does Rothesay, Isle of Bute (Chargeplace Scotland) have?

2 charging sockets: 2 × 22 kW Type 2.

### Who operates Rothesay, Isle of Bute?

Rothesay, Isle of Bute is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.

### How long does a Tesla Model Y Long Range take to charge at Rothesay, Isle of Bute (Chargeplace Scotland)?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Rothesay, Isle of Bute (Chargeplace Scotland)?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Rothesay, Isle of Bute (Chargeplace Scotland)?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Isle of Bute](https://ampmap.co.uk/chargers/united-kingdom/argyll-and-bute/isle-of-bute)
- [Chargeplace Scotland chargers](https://ampmap.co.uk/networks/chargeplace-scotland)

## Chargers near this site

- [Guildford Square · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-guildford-square-uk) - Type 2 7 kW · Guildford Square

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/chargeplace-scotland-rothesay-isle-of-bute-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 15 Mar 2020).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
