Chargeplace Scotland · EV charging site
S Carbrain Road
Cumbernauld, G67 2PL
S Carbrain Road is an EV charging site in Cumbernauld, North Lanarkshire, run by Chargeplace Scotland. Both of its sockets are 22 kW Type 2, and charging is listed as free. 5 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Arnold Clark Cumbernauld Kia (Arnold Clark Dealer Network), 0.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargeplace Scotland
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- Free(from Open Charge Map, 27 Sept 2019)
- Phone (from Open Charge Map)
- 0141 648 0750
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at S Carbrain Road (Chargeplace Scotland)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at S Carbrain Road (Chargeplace Scotland)?
Up to 22 kW AC via Type 2.
How many charging sockets does S Carbrain Road (Chargeplace Scotland) have?
2 charging sockets: 2 × 22 kW Type 2.
Who operates S Carbrain Road?
S Carbrain Road is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.
Where is the nearest charger with 50 kW or more to S Carbrain Road (Chargeplace Scotland)?
Arnold Clark Cumbernauld Kia (Arnold Clark Dealer Network) is 0.1 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at S Carbrain Road (Chargeplace Scotland)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at S Carbrain Road (Chargeplace Scotland)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at S Carbrain Road (Chargeplace Scotland)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Arnold Clark Cumbernauld Kia
- Bron Way Car Park
- Antonine Shopping Centre - 0115
- Greenfaulds Park & Ride, Cumbernauld
- Ravenswood Pitches
- The Red Deer
- Cheapest nearby
- Antonine Shopping Centre - 0115 · 65p per kWh · 50 kW · 0.5 mi
- Fastest nearby
- Arnold Clark Cumbernauld Kia · 150 kW · 0.1 mi