Chargeplace Scotland · EV charging site
Seggarsdean Court
Seggarsdean Court, Musselburgh, EH41 4L
Seggarsdean Court is an EV charging site in Musselburgh, East Lothian, run by Chargeplace Scotland. Both of its sockets are 7 kW Type 2. 6 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Aubigny Sports Centre Rapid Charger (Chargeplace Scotland), 0.6 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargeplace Scotland
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 0141 648 0750
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Seggarsdean Court (Chargeplace Scotland)?
Up to 7 kW AC via Type 2.
How many charging sockets does Seggarsdean Court (Chargeplace Scotland) have?
2 charging sockets: 1 × 7 kW Type 2, 1 × 7 kW Type 2.
Who operates Seggarsdean Court?
Seggarsdean Court is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.
Where is the nearest charger with 50 kW or more to Seggarsdean Court (Chargeplace Scotland)?
Aubigny Sports Centre Rapid Charger (Chargeplace Scotland) is 0.6 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Seggarsdean Court (Chargeplace Scotland)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Seggarsdean Court (Chargeplace Scotland)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Seggarsdean Court (Chargeplace Scotland)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Abbot's View, Haddington
- Aubigny Sports Centre Rapid Charger
- John Muir House (Electric Car Park)
- John Muir House Rapid Charger
- Long Stay Car Park Charging Hub
- Knox Academy, Haddington
- Fastest nearby
- Aubigny Sports Centre Rapid Charger · 50 kW · 0.6 mi