# Shapinsay Development Trust · Chargeplace Scotland

Web page: https://ampmap.co.uk/charger/chargeplace-scotland-shapinsay-development-trust-2-uk

Shapinsay Development Trust is an EV charging site in Kirkwall, Orkney Islands, run by Chargeplace Scotland. Both of its sockets are 7 kW Type 2, and charging is listed as free.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** B9059, KW17 2DY
- **Area:** Kirkwall, Orkney Islands, United Kingdom
- **Coordinates (latitude, longitude):** 59.03205, -2.90891

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 2 | Not listed |

- **Price:** Free (from Open Charge Map)

## Site information

- **Operator:** Chargeplace Scotland
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Shapinsay Development Trust (Chargeplace Scotland)?

The listed price is Free. Prices can change, so check the price at the charger before you start.

### How fast is charging at Shapinsay Development Trust (Chargeplace Scotland)?

Up to 7 kW AC via Type 2.

### How many charging sockets does Shapinsay Development Trust (Chargeplace Scotland) have?

2 charging sockets: 2 × 7 kW Type 2.

### Who operates Shapinsay Development Trust?

Shapinsay Development Trust is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.

### How long does a Tesla Model Y Long Range take to charge at Shapinsay Development Trust (Chargeplace Scotland)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Shapinsay Development Trust (Chargeplace Scotland)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Shapinsay Development Trust (Chargeplace Scotland)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Kirkwall](https://ampmap.co.uk/chargers/united-kingdom/orkney-islands/kirkwall)
- [Chargeplace Scotland chargers](https://ampmap.co.uk/networks/chargeplace-scotland)

## Chargers near this site

- [Shapinsay Development Trust · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-shapinsay-development-trust-uk) - Type 2 7 kW · Balfour
- [Marine Renewables Units](https://ampmap.co.uk/charger/marine-renewables-units-uk) - J-1772 · Unit 2, Warness Park
- [Unit 1 Warness Park](https://ampmap.co.uk/charger/unit-1-warness-park-uk) - J-1772 7 kW · Grainshore Road
- [Tickety Boo Ayre Service Station · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-tickety-boo-ayre-service-station-uk) - CCS 50 kW, CHAdeMO 50 kW · Burnmouth Road
- [Pickaquoy Centre Car Park · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-pickaquoy-centre-car-park-uk) - Type 2 22 kW · Muddisdale Road

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/chargeplace-scotland-shapinsay-development-trust-2-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 9 Apr 2018).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
