# Simpson Road Car Park · Chargeplace Scotland

Web page: https://ampmap.co.uk/charger/chargeplace-scotland-simpson-road-car-park-uk

Simpson Road Car Park is an EV charging site in Sanquhar, Dumfries and Galloway, run by Chargeplace Scotland. It has a single socket, with CCS and CHAdeMO at up to 50 kW, and the price is listed as 25p/kWh, minimum £1.50.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Simpson Road, DG4 6BP
- **Area:** Sanquhar, Dumfries and Galloway, United Kingdom
- **Coordinates (latitude, longitude):** 55.36846, -3.92340

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 50 kW | 1 | Not listed |
| CHAdeMO | 50 kW | 1 | Not listed |
| Type 2 | 43 kW | 1 | Not listed |

- **Price:** 25p/kWh, minimum £1.50 (from Open Charge Map)

## Site information

- **Operator:** Chargeplace Scotland
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Simpson Road Car Park (Chargeplace Scotland)?

The listed price is 25p/kWh, minimum £1.50. Prices can change, so check the price at the charger before you start.

### How fast is charging at Simpson Road Car Park (Chargeplace Scotland)?

Up to 50 kW DC via CCS, CHAdeMO, Type 2.

### How many charging sockets does Simpson Road Car Park (Chargeplace Scotland) have?

1 charging socket: 1 × 50 kW CCS, 1 × 50 kW CHAdeMO, 1 × 43 kW Type 2.

### Who operates Simpson Road Car Park?

Simpson Road Car Park is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.

### How long does a Tesla Model Y Long Range take to charge at Simpson Road Car Park (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Simpson Road Car Park (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Simpson Road Car Park (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Sanquhar](https://ampmap.co.uk/chargers/united-kingdom/dumfries-and-galloway/sanquhar)
- [Chargeplace Scotland chargers](https://ampmap.co.uk/networks/chargeplace-scotland)

## Chargers near this site

- [Blackaddie House Hotel](https://ampmap.co.uk/charger/blackaddie-house-hotel-uk) - Type 2 7 kW · Blackaddie Road
- [Blackaddie House Hotel, Sanquhar · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-blackaddie-house-hotel-sanquhar-uk) - Type 2 7 kW · Blackaddie House Hotel

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/chargeplace-scotland-simpson-road-car-park-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 24 Sept 2019).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
