Chargeplace Scotland · EV charging site
Step
Step, Stirling, FK7 7RP
Step is an EV charging site in Stirling, run by Chargeplace Scotland. Both of its sockets are 7 kW Type 2. 10 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Forthside Car Park, Stirling (Chargeplace Scotland), 0.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargeplace Scotland
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.15/kWh;min £1.00(from Open Charge Map, 6 Nov 2019)
- Phone (from Open Charge Map)
- 0141 648 0750
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Step (Chargeplace Scotland)?
The listed price is £0.15/kWh;min £1.00. Prices can change, so check the price at the charger before you start.
How fast is charging at Step (Chargeplace Scotland)?
Up to 7 kW AC via Type 2.
How many charging sockets does Step (Chargeplace Scotland) have?
2 charging sockets: 2 × 7 kW Type 2.
Who operates Step?
Step is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.
Where is the nearest charger with 50 kW or more to Step (Chargeplace Scotland)?
Forthside Car Park, Stirling (Chargeplace Scotland) is 0.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Step (Chargeplace Scotland)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Step (Chargeplace Scotland)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Step (Chargeplace Scotland)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Forthside Car Park, Stirling
- Forthside Park & Ride, Stirling
- Wellgreen Place, Stirling
- Western Nissan Stirling
- Colquhoun Street, Stirling
- Stirling, Springkerse Industrial Estate
- Cheapest nearby
- Stirling, Springkerse Industrial Estate · 90p per kWh · 160 kW · 0.7 mi
- Fastest nearby
- Stirling, Springkerse Industrial Estate · 160 kW · 0.7 mi