Chargeplace Scotland · EV charging site
Stonehaven Station Car Park
Stonehaven Train Station, Nigg, AB39 2NE
Stonehaven Station Car Park is an EV charging site at Stonehaven Train Station in Nigg, Aberdeen City, run by Chargeplace Scotland. Its 3 sockets reach up to 50 kW, with CHAdeMO and Type 2 at the top speed. Amp Map lists 1 other charge point named Stonehaven Station Car Park in Nigg. 3 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Stonehaven Station Car Park (Chargeplace Scotland), 70 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Chargeplace Scotland
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 0141 648 0750
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Stonehaven Station Car Park (Chargeplace Scotland)?
Up to 50 kW DC via Type 2, CHAdeMO.
How many charging sockets does Stonehaven Station Car Park (Chargeplace Scotland) have?
3 charging sockets: 1 × 43 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 50 kW Type 2.
Who operates Stonehaven Station Car Park?
Stonehaven Station Car Park is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.
Where is the nearest other charger with 50 kW or more to Stonehaven Station Car Park (Chargeplace Scotland)?
Stonehaven Station Car Park (Chargeplace Scotland) is 70 yards away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Stonehaven Station Car Park (Chargeplace Scotland)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Stonehaven Station Car Park (Chargeplace Scotland)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Stonehaven Station Car Park (Chargeplace Scotland)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Cheapest nearby
- Kirktown Garden Centre · 65p per kWh · 100 kW · 0.6 mi
- Fastest nearby
- Kirktown Garden Centre · 100 kW · 0.6 mi