# Stonehaven Station Car Park · Chargeplace Scotland

Web page: https://ampmap.co.uk/charger/chargeplace-scotland-stonehaven-station-car-park-uk

Stonehaven Station Car Park is an EV charging site in Nigg, Aberdeen City, run by Chargeplace Scotland. Its 3 sockets reach up to 50 kW, with CHAdeMO and Type 2 at the top speed.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Stonehaven Train Station, AB39 2NE
- **Area:** Nigg, Aberdeen City, United Kingdom
- **Coordinates (latitude, longitude):** 56.96630, -2.22564

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CHAdeMO | 50 kW | 1 | Not listed |
| Type 2 | 50 kW | 1 | Not listed |
| Type 2 | 43 kW | 1 | Not listed |

## Site information

- **Operator:** Chargeplace Scotland
- **Opening hours:** Not published
- **Access:** Public

## Common questions

### How fast is charging at Stonehaven Station Car Park (Chargeplace Scotland)?

Up to 50 kW DC via Type 2, CHAdeMO.

### How many charging sockets does Stonehaven Station Car Park (Chargeplace Scotland) have?

3 charging sockets: 1 × 43 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 50 kW Type 2.

### Who operates Stonehaven Station Car Park?

Stonehaven Station Car Park is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.

### How long does a Tesla Model Y Long Range take to charge at Stonehaven Station Car Park (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Stonehaven Station Car Park (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Stonehaven Station Car Park (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Nigg](https://ampmap.co.uk/chargers/united-kingdom/aberdeen-city/nigg)
- [Chargeplace Scotland chargers](https://ampmap.co.uk/networks/chargeplace-scotland)

## Chargers near this site

- [Stonehaven Station Car Park · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-stonehaven-station-car-park-2-uk) - CCS 50 kW, CHAdeMO 50 kW · Arduthie Road
- [Kirktown Garden Centre · POGO](https://ampmap.co.uk/charger/pogo-kirktown-garden-centre-uk) - CCS 100 kW · Fetteresso · From 65p/kWh
- [Market Square, Stonehaven · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-market-square-stonehaven-uk) - Type 2 7 kW · 34 Margaret Square

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/chargeplace-scotland-stonehaven-station-car-park-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 5 May 2023).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
