# Stromness Ferry Terminal Rapid (triple Outlet) · Chargeplace Scotland

Web page: https://ampmap.co.uk/charger/chargeplace-scotland-stromness-ferry-terminal-rapid-triple-outlet-uk

Stromness Ferry Terminal Rapid (triple Outlet) is an EV charging site in Stromness, Orkney Islands, run by Chargeplace Scotland. It has a single socket, with CHAdeMO and CCS at up to 50 kW.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Stromness Ferry Terminal, KW16 3BH
- **Area:** Stromness, Orkney Islands, United Kingdom
- **Coordinates (latitude, longitude):** 58.96405, -3.29656

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 50 kW | 1 | Not listed |
| CHAdeMO | 50 kW | 1 | Not listed |
| Type 2 | 43 kW | 1 | Not listed |

- **Price:** £0.25/kWh;min £2.00; overstay £5.00 after 60 minutes (from Open Charge Map)

## Site information

- **Operator:** Chargeplace Scotland
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Stromness Ferry Terminal Rapid (triple Outlet) (Chargeplace Scotland)?

The listed price is £0.25/kWh;min £2.00; overstay £5.00 after 60 minutes. Prices can change, so check the price at the charger before you start.

### How fast is charging at Stromness Ferry Terminal Rapid (triple Outlet) (Chargeplace Scotland)?

Up to 50 kW DC via CHAdeMO, CCS, Type 2.

### How many charging sockets does Stromness Ferry Terminal Rapid (triple Outlet) (Chargeplace Scotland) have?

1 charging socket: 1 × 50 kW CHAdeMO, 1 × 50 kW CCS, 1 × 43 kW Type 2.

### Who operates Stromness Ferry Terminal Rapid (triple Outlet)?

Stromness Ferry Terminal Rapid (triple Outlet) is on the Chargeplace Scotland network. For site issues, the operator lists 0141 648 0750.

### How long does a Tesla Model Y Long Range take to charge at Stromness Ferry Terminal Rapid (triple Outlet) (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Stromness Ferry Terminal Rapid (triple Outlet) (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Stromness Ferry Terminal Rapid (triple Outlet) (Chargeplace Scotland)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Stromness](https://ampmap.co.uk/chargers/united-kingdom/orkney-islands/stromness)
- [Chargeplace Scotland chargers](https://ampmap.co.uk/networks/chargeplace-scotland)

## Chargers near this site

- [Stromness Ferry Road (West) Long Stay Car Par · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-stromness-ferry-road-west-long-stay-car-par-uk) - Type 2 22 kW · 63 John Street
- [Ferry Road (West) Car Park · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-ferry-road-west-car-park-uk) - CCS 50 kW, CHAdeMO 50 kW · Ferry Road
- [Old Academy · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-old-academy-uk) - Type 2 11 kW · Back Road
- [Stromness Care Home Ac22 Dual · Chargeplace Scotland](https://ampmap.co.uk/charger/chargeplace-scotland-stromness-care-home-ac22-dual-uk) - Type 2 22 kW · Quoys

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/chargeplace-scotland-stromness-ferry-terminal-rapid-triple-outlet-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 2 Jan 2020).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
